1513.4730.02
Control software of R&SIQR for R&STSMW via LAN (optimized for drive test applications as well as touch screens of the R&SIQR and Laptops) - Definition of filters for two RF frontends - Settings of drive test parameters of the R&STSMW (frequency...
PN:[IQR-K1]
Open Market/ 22 Weeks
1328.5412.02
Frequency extension for ZND with ZND-K5 up to 8.5 GHz Full Test Set (requires ZND-K5) (not compatible with ZND-K1 and ZND-K6) (software license)
PN:[ZND-K8]
Open Market/ 22 Weeks
5038.9120.02
Material set Continental TS-RB12-UWB Test Solution for UWB consists of: 1) 19", 12 U rack for integration of system components delivered with - rail's for integrating 19" components - top fan unit, temperature regulated - Top cover with ventilation...
PN:[TS-RB12UWB]
Open Market/ 22 Weeks
1800.2307.02
200 MHz high voltage differential probe, 750 Vpk, 300 V CAT III, 250:1/25:1, 5 MOhm // 2,0 pF (differential), including accessories (soft bag, R&SRT-ZA22 safety test leads, R&SRT-ZA24 accessory set)
PN:[RT-ZHD07]
Open Market/ 22 Weeks
1800.2107.02
100 MHz high voltage differential probe, 1500 Vpk, 1000 V CAT III, 500:1/50:1, 10 MOhm // 2,0 pF (differential), including accessories (soft bag, R&SRT-ZA22 safety test leads, R&SRT-ZA24 accessory set)
PN:[RT-ZHD15]
Open Market/ 22 Weeks
1332.4730.50
Cable Set for ZNA-K9: Combines signals from Port 1 and Port 3 to a two-tone signal at Port 1 (for IM and ZNA-K9 embedded LO GD measurements) for ZNA50, 4-port (2.4mm - 2.4mm)
PN:[ZNA50-Z9]
Open Market/ 22 Weeks
1332.4730.67
Cable Set for ZNA-K9: Combines signals from Port 1 and Port 3 to a two-tone signal at Port 1 (for IM and ZNA-K9 embedded LO GD measurements) for ZNA67, 4-port (1.85mm - 1.85mm)
PN:[ZNA67-Z9]
Open Market/ 22 Weeks
1332.4730.43
Cable set for ZNA-K9 for R&SZNA43 (4 ports) with 2.92 mm (m) connectors Combines signals from port 1 and port 3 to a two-tone signal at port 1 (for Intermodulation and two-tone mixer Group Delay measurements)
PN:[ZNA43-Z9]
Open Market/ 22 Weeks
1332.4730.44
Cable set for ZNA-K9 for R&SZNA43 (4 ports) with 2.4 mm (m) connectors Combines signals from port 1 and port 3 to a two-tone signal at port 1 (for Intermodulation and two-tone mixer Group Delay measurements)
PN:[ZNA43-Z9]
Open Market/ 22 Weeks
1332.4730.26
Cable set for ZNA-K9 for R&SZNA26 (4 ports) with 3.5 mm (m) connectors Combines signals from port 1 and port 3 to a two-tone signal at port 1 (for Intermodulation and two-tone mixer Group Delay measurements)
PN:[ZNA26-Z9]
Open Market/ 22 Weeks
1800.2207.02
200 MHz high voltage differential probe, 1500 Vpk, 1000 V CAT III, 500:1/50:1, 10 MOhm // 2,0 pF (differential), including accessories (soft bag, R&SRT-ZA22 safety test leads, R&SRT-ZA24 accessory set) only in combination with ZHD-B15
PN:[RT-ZHD16]
Open Market/ 22 Weeks
1800.2007.02
100 MHz high voltage differential probe, 6000 Vpk, 1000 V CAT III, 1000:1/100:1, 40 MOhm // 2,0 pF (differential), including accessories (soft bag, R&SRT-ZA22 safety test leads, R&SRT-ZA24 accessory set) only in combination with ZHD-B15, -B30 or...
PN:[RT-ZHD60]
Open Market/ 22 Weeks
5038.9194.02
Material set Continental PF5030 Test Solution for HEV consists of: - 1x TDK-Lambda GEN+80V/65A - 1x TDK-Lambda GEN60-12.5 - 1x Singaltec Transducer System MCTS2/6CH - 3x Current Transducer IT 60-S - 3x Burden resistor MCTS/BR50/0.01 - 1x Gpel SFX/PXI...
PN:[PFCMAT14]
Open Market/ 22 Weeks
5038.9042.02
Option Cable set to the shielded chamber (all variants) connecting the changeable fixture with the test chamber - 1x USB type-B(m) to USB type-A(m) - 1x RJ-45 to RJ-45 - 1x Sub-D50(m) to Sub-D50(f) - 1x SMA(m) to SMA(m), EF316, 4GHz - length 4 m
PN:[TS-FIAM-C1]
Open Market/ 22 Weeks
1147.2736.02
HZ-15 Probe set for E and H nearfield emissions 30 MHz to 3 GHz
PN:[HZ-15]
Open Market/ 22 Weeks
1328.6660B01
Bundle consisting of - R&SFPC1000-RM Spectrum Analyzer 5kHz-1GHz with FPC-K43 - R&SHM60502DP Line impedance stabilization network, 9kHz to 30MHz (CISPR 16), max. 16A (DE version, safety plug, 230V) - R&SELEMI-EP EMI TEST PACKAGE (license dongle and...
PN:[EMC-SET3]
Open Market/ 22 Weeks